Monday, April 14, 2008

Moving Right Along

The house is moving right along despite my non-posting. Dalton was sick last week so I was tied up with him.

Last week, the electrical wire was pulled. The dormers were finished. The columns were installed in the front and back of the house. The tub/shower units and jacuzzi tub was installed. And finally, Darren came up and pulled the wire for the alarm system on Saturday. Thanks Darren.

I have pictures, but Joey has the camera. I'll post them tomorrow.

This week, the builder moved the dirt around the front of the house so that the cables for the post-tension slab can be pulled. Once this is complete, the brick layers can return to finish the brick. The front of the house looks like a conventional slab, but actually it isn't. We also ordered the shingles so those should be installed soon.

Happy Building,
Allyson